Electrical dashboard Permit requirements The on-line allow is accessible for nature in keolistravelservices.com v a residential zoning district. Zoning district information is obtainable on-line by clicking E-Zoning.

You are watching: Aluminum wire for 100 amp service

This allow will permit replacement the the existing electrical panel up to a maximum of 200 amps in the very same location.Note: some properties in keolistravelservices.com have an underground electrical power feeding from PG&E. If your property has actually an underground power feed, verify through PG&E that they can provide increased strength for a bigger panel size.To determine if the proposed dashboard is sized accordingly for your demands OR if you want to see if the proposed dashboard is big enough for an all-electric house, please complete an electric panel sizing spreadsheet. An electric permit is forced for replacement and also upgrade that the key electrical company panel before installation that the new panel. Complying with is a listing of the general requirements for electric panel replacements based upon the 2019 California electric Code. This magazine is to plan to provide general information, contact the building Safety division for any type of questions or additional information.General Requirements - The main electrical organization shall be set up with strictly conduit. Electric metallic tubing may be offered where the business drop is attached to the building. The business entrance cable might be used, provided the authorized fittings are used with the cable, such as a rain-tight business head or creating the cable goose-neck, taped or painted, and also held securely in place by a fitting authorized for the purpose. (Article 230)The minimum size business conduit shall be 1-1/4”. The minimum size business entrance wire shall be rated 100 amperes minimum for solitary family dwellings. For solitary family homes, the service disconnect way shall have actually a rating of much less than 100 amperes, 3-wire. A larger business may be compelled for brand-new homes or additions to present homes based on the actual load calculations. (CEC 230.79(C))Service entrance Conductors (Wires) – Conductors that extend across a roof shall have a minimum vertical clearance of 3’ above the roof surface ar for roofs sloped 4:12 or much more (18” clearance required when conductors enter through the roof overhang/eave). The service head candlestick be situated so that the organization drops, along with the open up wires in between the service head and service drop, will have a minimum clearance that 10’ vertically over ground and 3’ radius indigenous doors and also windows. (Article 230.24)The neutral (grounded) conductor must be determined with white tape at both terminals. (Article 200.6(B)(4))Service enntrance gate conductors and cables candlestick be approved for a wet location and, when exposed to direct sunlight, shall be noted and marked as “sunlight resistant.” business entrance conductors and also conduit shall be sized according come the following table (based ~ above CEC thing 9 table 1):
SERVICE entrance CONDUCTORS SIZE and also RATING
Service or Feeder RatingCopper ConductorsAluminum or Copper-CladAluminumMinimum ConduitSize
100 Amps#4 AWG#2 AWG1 ¼ inch
125 Amps#2 AWG#1/0 AWG1 ¼ inch
150 Amps#1 AWG#2/0 AWG1 ¼ inch
200 Amps#2/0 AWG#4/0 AWG1 ½ inch
The ground connection conductors should be figured out by white or grey tape in ~ both ends (200.6).Meter location - PG&E calls for the height of the meter to it is in 48” to 66” above the ground. PG&E prohibits new meters ~ above exterior walls nearby to bedrooms or bedroom closets. A minimum horizontal clearance the 36” native the gas meter and also piping is required.

See more: What Obligations Did States Have To Citizens Protecting, Free Flashcards About Chapter 2 Government

Working space - The clear working an are in front of the panel shall be 30” broad by 36” deep with a minimum headroom clearance the 6’-6” (Article 110.26)Grounding that Services - grounding shall consist of a consistent grounding electrode conductor operation from the dashboard to a ground pole (grounding electrode) and also to the cold water pipe. Ground connection of the electrical organization at the key water line need to be within the an initial 5’ the water piping into the building. The underground water service shall not be provided as the ground connection electrode there is no supplemental electrode. For brand-new structures and enhancements to present structures, a concrete encased floor electrode shall it is in installed. This candlestick consist of 20’ of ½” ceiling or zinc-coated rebar or bare copper cable in the section of the footing in contact with earth. (CEC 250.52(A)(3)(1) and 250.52(A)(3)(2))For present structures, the ground connection electrode shall be nonferrous (copper), listed, and also not be less than 5/8” in diameter. The electrode shall be set up such that at the very least 8’ of length is in contract v the soil. The upper finish of the electrode shall it is in flush through or listed below ground level unless the above-ground end and also the ground connection electrode conductor attachments is protected against physical damage. (CEC 250.52 (A)(5), 250.64(B))The required grounding electrode conductor (from electrode come panel) dimension is provided in the complying with table:
GROUNDING ELECTRODE CONDUCTOR SIZING (Table 250.66)
Size of main PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#8 AWG#6 AWG
150 Amps#6 AWG#4 AWG
200 Amps#4 AWG#2 AWG
Bonding - Bonding of the hot, cold, and gas currently is forced when the electrical panel is replaced. Bonding of the hot, cold, and also gas lines is required with water service replacements (if making use of a less conductive material than is existing) and also for all re-pipes. Bonding candlestick consist of a constant bond jumper mounted at the water heater in between the hot, cold, and also gas lines. The bonding jumper shall it is in sized based upon the following table. (CEC250.4(A)(4))
BONDING JUMPER SIZING (Table 250.102(C)(1))
Size of key PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#6 AWG#4 AWG
150 Amps#6 AWG#4 AWG
200 Amps#6 AWG#4 AWG
The electrical Panel allow is NOT accessible on-line if friend are: installing the brand-new electrical dashboard in a various location. installing a brand-new electrical panel bigger than 200 amps. Installing extr sub-panels through the brand-new electrical panel. Performing extr electrical occupational in conjunction through the brand-new electrical dashboard installation.
If any of the over conditions apply, the allow shall it is in issued in ~ the One-Stop allow Center, City Hall, 456 W Olive Avenue. Specific process information is easily accessible at the Building division web site.
InspectionsA minimum of two inspections space required, a energy release and a final. The energy release inspection should be scheduled when the new panel is installed and ready to be hooked increase the PG&E supply. The building inspector will administer a utility release kind which will must be detailed to PG&E to have actually the it is provided hooked as much as the brand-new panel. A cable lath inspection is compelled for stucco repairs. A final inspection should be scheduled after every one of the occupational is complete.
*